Large water resources development projects means Dam or Reservoir which has the storage capacity more than 100 million cu. m. the storage area more than 15 sq. km. and the irrigated areas more than 80,000 rai. The study areas include projects which establish before the announced in August 24, 1992 by the Ministry of Science and Technology about the definition for types and sizes of projects or activities of government / state enterprises / private must prepare the Environmental Impact Analysis report. There are 31 projects in Thailand most of them have not done the Environmental Impact Study (EIA) before the construction, such projects require environmental impact study after the operation. To determine the environmental impact both positive and negative can lead to set the measures for correct / reduce environmental impact and appropriate for the environment monitoring.
The study of the environmental impact study after the operation for large water resources development projects include as following:
| Name of Project | Guidelines for Post Environmental Impact Assessment of Large Dams in Thailand |
| Location | Nation-wide |
| Client | Office of Natural Resources and Environmental Policy and Planning (ONEP) |
| Duration | May 2007 - January 2008 |
| Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must