Since the EIA of Phuket Airport Development Project had been approved by the OEPP, the mitigation and monitoring measures in the EIA report must be implemented continuously that are:
-to check the mitigation measures; and
-to monitor the coastal erosion, water quality, air quality, noise
and vibration, wastewater management, bird and forest ecology.
Project Environmental Quality Monitoring the works as follow :
•Checking the mitigation measures.
•Monitoring the coastal erosion, water quality, air quality, noise and vibration, wastewater management, bird and forest ecology.
•Preparing the report.
| Name of Project | Environmental Quality Monitoring of Phuket Airport Extension Project Year 2003 |
| Location | Phuket Province |
| Client | Airports of Thailand Public Company Limited |
| Duration | October 2001 – August 20 |
| Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must